Project Stages
St Michael le Belfrey church needs repairing and reordering. Not only has no significant work been done on the building for 150 years, but life, worship, mission and ministry is now very different. The Church needs a better reordered space to support its mission while preserving a beautiful Grade 1 listed building. This is a significant and responsible task, which is costly in terms of time, energy and resources. But we are not daunted, as we believe that God has called us to do this, and do it well - not just for ourselves but for future generations too. The Impact project is following the RIBA Plan of Work which organises the process of briefing, design, construction, handover and use of building projects into key stages from Stage 0 to Stage 7.
+ Stage 0: Strategic Definition
+ Stage 1: Preparation and Brief
RIBA Plan of Works 2020
LDN Architects - the competition winners with one of their competition entry boards
+ Stage 2: Concept Design
Agreed Concept Design - Proposed West End entrances
Agreed Concept Design - Ground Floor
Agreed Concept Design - First Floor
Agreed Concept Design - Proposed Gallery
+ Stage 3: Developed Design
Developed Design drawings for proposed repairs to Bell Turret
Proposed Roof Scaffold Design Section
Proposed Storage and Ideas for Staging
Developed design - proposed lift to Gallery